Tuesday, March 16, 2010

Bathroom break

Off to the bathroom we went.  Making sure everything was tight, we turned on the water.

031

032

Yeah, we have a running bathtub. Yes, I know the handles are backwards, but that’s an easy fix.

Now on to the floor, which I decided to tackle myself.

034 035 036003 - Copy

The porcelain tile floor didn’t turn out to bad, it just took a long time to do.  A cupboard with two drawers was also installed to make use of otherwise wasted space.

005 - Copy  Also a few doors were hung.

002 - Copy And the wall upstairs that holds all of the plumbing was finally put up.

001 - Copy (2)

0 comments:

Post a Comment